Frequently Asked Questions
13 DETAILED ANSWERS

Engineering, subsidies & net metering explained.

Clear, truthful answers to the most common technical, regulatory, and financial questions regarding solar installations in Delhi NCR, Haryana, UP, and Uttarakhand.

Live 3D Digital Twin
Under the PM Surya Ghar scheme (2024–present), residential individual rooftop systems receive direct DBT capital subsidy: ₹30,000 for a 1 kW system, ₹60,000 for a 2 kW system, and ₹78,000 for 3 kW and above. In Special Category states like Uttarakhand, the subsidy is ₹33,000 for 1 kW, ₹66,000 for 2 kW, and up to ₹85,800 for 3 kW+. Group Housing Societies / RWAs are eligible for ₹18,000 per kW up to 500 kW for common facilities.
The subsidy is transferred directly by the Central Government via Direct Benefit Transfer (DBT) into the consumer’s bank account linked to their electricity connection. The process begins on the National Portal (pmsuryaghar.gov.in). As your engineering EPC partner, Broadvision Clean Energy assists with all technical documentation, single-line diagrams (SLD), DCR compliance certificates, and DISCOM commissioning filings required to release your subsidy.
To qualify for government subsidies under PM Surya Ghar and state schemes, MNRE mandates that both solar photovoltaic cells and modules must be manufactured within India (DCR compliant). If non-DCR imported panels are used, the system cannot receive government subsidies. Broadvision Clean Energy only specifies certified Tier-1 DCR modules for all subsidy-seeking installations.
A net meter is a bidirectional electricity meter installed by your local DISCOM (such as BSES in Delhi, DHBVN/UHBVN in Haryana, UPPCL in UP, or UPCL in Uttarakhand). During the day, your solar panels power your home directly; any extra power generated is automatically sent to the grid, spinning the meter backwards. At night, you draw power from the grid. At the end of the billing cycle, you only pay for the "net" electricity consumed.
Typically, the entire process takes between 2 to 4 weeks depending on the state DISCOM. Delhi (BRPL/BYPL/TPDDL) has streamlined single-window portals with 15–20 day turnarounds. In Haryana and UP, approvals generally conclude within 3–4 weeks following physical site inspection and bi-directional meter testing. Broadvision Clean Energy manages all liaison with DISCOM engineers from start to finish.
Under current DISCOM regulations in Delhi, Haryana, and Uttar Pradesh, the maximum allowable solar rooftop capacity is generally capped at 100% of your sanctioned load (contracted demand), subject to local distribution transformer (DT) headroom. If your rooftop can support a larger solar system, Broadvision Clean Energy can assist in applying for a sanctioned load enhancement with your DISCOM.
As an engineering rule of thumb, every 1 kW of solar capacity requires approximately 80 to 100 square feet (around 7.5 to 9.5 square meters) of shadow-free rooftop space. For instance, a typical 3 kW residential rooftop installation requires approximately 250 to 300 square feet of unobstructed space facing south or south-west.
No. Broadvision Clean Energy prioritizes structural integrity above all else. For flat concrete RCC roofs, we utilize pre-cast concrete ballast blocks or anchored galvanized stub columns with industrial chemical waterproofing seals (zero water seepage). For industrial metal roofs, we utilize non-penetrating standing seam or seam-clamp systems that leave roof sheets intact.
Yes! We specialize in elevated structural designs. By fabricating hot-dip galvanized elevated structures raised 7 to 9 feet above the roof surface, your panels form a high canopy while preserving 100% of your terrace floor for family use, leisure, or gardening, while shielding the roof beneath from harsh summer heat.
Under Section 32 of the Income Tax Act, commercial enterprises and manufacturing industries can claim 40% Accelerated Depreciation (AD) in the first year of solar asset commissioning. When combined with corporate income tax rates, this provides an immediate corporate tax shield that can recover up to 10–15% of the total project investment within the very first financial year.
Because commercial and industrial grid electricity tariffs in Delhi-NCR, Haryana, and UP average ₹8.5 to ₹11+ per unit, commercial solar systems boast attractive payback economics—typically recovering their initial capital expenditure in 3 to 4 years. With a 25-year panel design life, the system yields free electricity for over two decades thereafter.
We only deploy tier-1 hardware with industry-leading manufacturer warranties: Solar PV modules come with a 10–12 year product warranty and a 25 to 30 year linear power performance warranty (guaranteeing ~80-85% output at year 25). Grid-tied inverters carry 5 to 10 year manufacturer replacement warranties. Broadvision Clean Energy also provides a comprehensive workmanship warranty covering installation and structural stability.
Due to dust and particulate matter in North India (especially during dry pre-monsoon and post-harvest winter months), regular cleaning is vital. We recommend washing panels every 15 to 20 days with soft water during early mornings or late evenings when panels are cool. Regular cleaning preserves between 8% to 15% of solar power generation that would otherwise be lost to dust soiling.
Broadvision Clean Energy engineering helpline
ENGINEERING HELPLINE
Direct Engineering Helpline
Have a unique roof architecture or load question?
Speak directly with a practicing solar engineer, Monday to Saturday 9AM–6PM.
Broadvision Engineering Guarantee

Schedule your on-site engineering consultation.

Let our team verify shadow profiles, DISCOM transformer headroom, and structural anchoring on your premises.

Detailed 3D shadow profile & structural rooftop audit
Full DISCOM net-metering & PM Surya Ghar portal handling
Tier-1 bifacial panels & certified European/Indian inverters