Terms of service & engineering disclaimers.
Transparent parameters governing solar estimates, PM Surya Ghar subsidy processing, DISCOM approvals, and project feasibility surveys.
1. Solar Yield & Financial Calculator Basis
Our interactive estimator models conservative North India generation at 120 kWh (units) per kW per month (roughly 1,440 kWh/kW/year) with an indicative 72% monthly bill offset and 90–100 sq ft shadow-free roof area per kW. Actual generation varies by location solar irradiance, tilt/azimuth angle, tree or parapet shading, ambient heat, module soiling/cleaning discipline, and local grid outage hours.
2. PM Surya Ghar & State Subsidy Rules
Central Financial Assistance (CFA) under PM Surya Ghar: Muft Bijli Yojana (e.g., ₹30,000 for 1 kW, ₹60,000 for 2 kW, ₹78,000 for 3 kW+ residential on-grid; ₹85,800 special category where applicable) and state-level incentives (such as Uttar Pradesh top-ups or Delhi GBI) are disbursed directly by government agencies via Direct Benefit Transfer (DBT) or utility billing credits—not deducted unilaterally by private EPC vendors before sanction.
3. DISCOM Net Metering & Grid Sanctions
Net-metering technical feasibility, sanctioned load enhancement approvals, distribution transformer (DT) headroom, and bidirectional meter installation timelines are governed exclusively by respective DISCOMs and State Electricity Regulatory Commissions (including BSES Rajdhani, BSES Yamuna, Tata Power-DDL, DHBVN, UHBVN, UPPCL, NPCL, UPCL, and Pan-India state utilities). Broadvision Clean Energy manages application documentation and liaison, while statutory inspection timelines remain subject to utility schedules.
4. Track Record & Project Capacity Disclosure
Published project profiles distinguish strictly between commissioned installations (such as 2,000+ UREDA solar street lighting units in Uttarakhand, NIMS 50 kW, Vikas Bhavan 30 kW, BSES Yamuna residential net-metered installations, and Muzaffarnagar/Shamli commissions) and broader company-profile capacities (3,600+ kW stated as under consideration/pipeline). Manufacturers' linear power output and inverter hardware warranties remain governed by respective Tier-1 OEM warranty terms alongside our workmanship standards.
