Government Subsidies & Policies
LAST VERIFIED: OCT 2024 / ACTIVE 2026

PM Surya Ghar & Indian solar schemes guide.

Comprehensive, verified guide to national and state solar financial assistance: PM Surya Ghar Muft Bijli Yojana, PM-KUSUM agricultural incentives, and DISCOM net-metering regulations across Delhi, Haryana, UP, and Uttarakhand.

Live 3D Digital Twin
Official MNRE & State DISCOM Data • Last verified: October 2024 (Active Guidelines 2026)
Central Flagship Scheme

PM Surya Ghar: Muft Bijli Yojana.

Launched by the Government of India in February 2024, PM Surya Ghar delivers direct central DBT subsidies for residential rooftop solar systems to power 1 Crore homes.

Capacity SlabGeneral Category States (Delhi, Haryana, UP)Special Category States (Uttarakhand, HP, NE)Ideal Household Usage
1 kW Capacity₹ 30,000₹ 33,000Ideal for small residential homes with 90–120 units monthly consumption.
2 kW Capacity₹ 60,000₹ 66,000Standard residential capacity covering 200–250 units monthly consumption.
3 kW to 10 kW Capacity₹ 78,000 (Fixed Cap)₹ 85,800 (Fixed Cap)Maximum central subsidy cap for single residential connection.
Group Housing Societies (GHS / RWA)₹ 18,000 per kW₹ 18,000 per kWCapped at 500 kW for common facilities including water pumps, lighting, and EV chargers.
Instant Subsidy Estimator

Test Your Subsidy by System Capacity

Target Solar System Size:3 kW
1 kW2 kW3 kW (Max Cap)5 kW10 kW
Direct Bank Transfer (DBT):
₹ 78,000
Maximum single-meter central subsidy reached.
Apply Now

Step-by-Step PM Surya Ghar Portal Process (Handled by Broadvision Clean Energy)

Phase 1
Register on the National Portal (pmsuryaghar.gov.in) with DISCOM consumer number.
Phase 2
Submit rooftop feasibility application; DISCOM conducts technical feasibility verification.
Phase 3
Execute EPC agreement with registered solar installer (Broadvision Clean Energy handles documentation).
Phase 4
Installation of DCR-compliant modules, bidirectional net meter installation and DISCOM inspection.
Phase 5
Generation of DISCOM commissioning certificate followed by direct DBT subsidy transfer.
Agricultural Solarisation

PM-KUSUM Scheme Components.

The Pradhan Mantri Kisan Urja Suraksha evam Utthaan Mahabhiyan powers agricultural energy independence and generates supplementary revenue for farmers and rural landowners.

Decentralized ground mounted solar power plant under PM-KUSUM Component A
0.5 MW TO 2 MW PLANTS
Component A

0.5 MW to 2 MW Solar Plants

Set up decentralized ground-mounted or stilt-mounted solar plants on barren or uncultivable agricultural land within 5 km of a 33/11 kV substation. DISCOM purchases generated electricity under long-term 25-year PPAs at SERC-determined tariffs.

• Guaranteed 25-Year Power Purchase Agreement
• Supplementary steady farm income
Standalone solar water pump installation under PM-KUSUM Component B
SOLAR AGRICULTURE PUMPS
Component B

Standalone Solar Pumps (up to 7.5 HP)

Installation of standalone solar agriculture pumps to replace diesel engines in off-grid farmlands. Heavily subsidized: 30% Central Subsidy + 30% State Subsidy (60% to 80% total subsidy), leaving only 20% to 40% farmer contribution.

• Eliminates ongoing diesel expenditure
• Reliable daytime irrigation
Solarisation of agricultural pumps and dedicated feeders under PM-KUSUM Component C
FEEDER SOLARISATION & NET-METERING
Component C

Solarisation of Grid Pumps & Feeders

Solarisation of existing grid-connected agricultural pumps and agricultural feeder solarisation (FLS). Farmers can irrigate daytime crops and sell surplus electricity back to the DISCOM via net metering.

• 60% combined Central & State subsidy
• Direct net metering export revenue
State Regulations

State DISCOM net metering policies.

Net-metering regulations, sanctioned load limits, and settlement periods across our four operating territories.

Delhi (NCT) solar net metering installations and DISCOM infrastructure

Delhi (NCT)

Active Policy
Key DISCOMs: BSES Rajdhani (BRPL), BSES Yamuna (BYPL), Tata Power DDL (TPDDL)
Single Window: Delhi Solar Portal / DISCOM Rooftop Single Window
Metering Model: Net Metering, Virtual Net Metering (VNM) & Group Net Metering (GNM)
Sanction Ceiling: Up to 100% of sanctioned load for residential; up to 100% for C&I subject to transformer DT capacity
Energy Settlement: Annual settlement (usually October to September or April to March)
State Highlights:
•Delhi Solar Policy provides Generation-Based Incentive (GBI) of ₹3/unit for residential up to 3 kW for 5 years.
•State capital subsidy of ₹2,000 per kW up to a maximum of ₹10,000 per consumer.
•Virtual Net Metering enables apartment and flat owners to access solar benefits from collective arrays.
•Rapid digital net-meter testing and commissioning within 15–20 days.
Haryana solar net metering installations and DISCOM infrastructure

Haryana

Active Policy
Key DISCOMs: DHBVN (Dakshin Haryana), UHBVN (Uttar Haryana)
Single Window: SARAL Haryana / DHBVN / UHBVN Rooftop Solar Portal
Metering Model: Net Metering for LT Domestic, Net Billing / Gross Metering for large HT
Sanction Ceiling: Rooftop capacity up to 100% of sanctioned load (1 kW minimum)
Energy Settlement: Annual settlement at average power purchase cost (APPC) for surplus export
State Highlights:
•Universal Central DBT subsidy under PM Surya Ghar: ₹30,000 (1 kW), ₹60,000 (2 kW), and ₹78,000 (3 kW+).
•Additional state financial assistance of up to ₹50,000 for Antyodaya/PPP-verified low-income households (taking total assistance up to ₹1,10,000).
•Single-window fast-track approvals through SARAL portal.
•Mandatory solar rooftop mandates for commercial buildings, educational campuses and large residential plots (>500 sq yards).
•Strong industrial solar incentives across Gurugram, Faridabad, Sonipat, and Panipat clusters.
Uttar Pradesh solar net metering installations and DISCOM infrastructure

Uttar Pradesh

Active Policy
Key DISCOMs: PVVNL, MVVNL, DVVNL, PuVVNL, NPCL (Noida Power)
Single Window: UPNEDA / UPPCL Rooftop Solar Portal
Metering Model: Net Metering for Domestic & Agriculture; Net Billing / Gross Metering for C&I
Sanction Ceiling: Up to 100% of connected load (subject to 80% distribution transformer ceiling)
Energy Settlement: Annual settlement in the billing cycle of September/October
State Highlights:
•UP Solar Energy Policy provides additional State Subsidy top-up of ₹15,000 for 1 kW and ₹30,000 for 2 kW+ (up to ₹1,08,000 combined central + state subsidy).
•Direct DBT credit into consumer bank accounts in coordination with UPNEDA and UPPCL.
•Heavy solar adoption in Noida, Greater Noida, Ghaziabad, Lucknow, Meerut, and Kanpur industrial belts.
•Exemption of electricity duty on solar generation for captive industrial consumption.
Uttarakhand solar net metering installations and DISCOM infrastructure

Uttarakhand

Active Policy
Key DISCOMs: Uttarakhand Power Corporation Ltd (UPCL)
Single Window: UREDA / UPCL Solar Portal
Metering Model: Net Metering for LT consumers, Special Category Central Subsidies
Sanction Ceiling: Up to 100% of contracted load
Energy Settlement: Annual settlement
State Highlights:
•Classified under Special Category States with 10% higher central subsidy rates: ₹33,000 for 1 kW, ₹66,000 for 2 kW, and up to ₹85,800 for 3 kW+.
•Specialized engineering requirements for high wind-load terrain, snow load, and mountain roof pitches in Dehradun, Haridwar, Nainital, and Pantnagar.
•Microgrid & off-grid battery hybrid systems widely supported for remote and hospitality facilities.
Mandatory Government Content Disclaimer:All subsidy amounts, percentage shares, eligibility rules, DISCOM application portals, and net metering processes described here are indicative and sourced from official Ministry of New and Renewable Energy (MNRE) and respective state electricity regulatory commission (SERC) notifications as of October 2024. Government subsidy programs, DISCOM processing fees, transformer headroom allocations, and state policy top-ups are subject to periodic administrative updates and DISCOM verification. Broadvision Clean Energy handles all documentation on behalf of our clients but does not control government approval timelines.
Broadvision Engineering Guarantee

Need assistance applying for PM Surya Ghar?

Our dedicated regulatory team assists with single-line diagrams, DISCOM transformer checks, and National Portal filings.

Detailed 3D shadow profile & structural rooftop audit
Full DISCOM net-metering & PM Surya Ghar portal handling
Tier-1 bifacial panels & certified European/Indian inverters